Built for the projects where execution mistakes are expensive.

BuildUNIX replaces verbal approvals, untracked defects, and screenshot-driven updates with hard-gated sequencing, tamper-proof photo evidence, live visibility, and automatic reporting.

Block A · Floor 14

Slab Casting Phase 3 of 7

Verified
Phase progress43%
Pre
During
Post
PMC ApprovalApproved
Client QCApproved
Safety + MEPPending
Next phaseLocked until QC

What changes when the site runs through BuildUNIX.

The product is not another dashboard. It is an enforcement layer for how PMC-led construction should already operate.

01

Sequencing errors become impossible

The dependency engine hard-gates every subphase. If the required predecessor is not PMC-approved, the next step stays locked. No workaround. No verbal override.

02

Every milestone has real evidence

Pre, During, and Post photos are mandatory. Native camera only. Every image carries GPS coordinates, UTC timestamp, user identity, and a SHA-256 integrity hash.

03

PMC approvals move faster

When contractors submit work, PMC Engineers get an instant notification and can inspect photo evidence in real time instead of waiting for the next physical site visit.

04

Defects become formal workflows

PMC, Safety, MEP, and Client QC issues are raised as structured snag tickets with threaded evidence and mandatory resolution photos instead of disappearing into calls and chats.

05

Management sees the site live

Color-coded heatmaps show every phase, block, and subphase in real time. Teams stop relying on screenshots, weekly calls, and reactive escalation.

06

Reporting happens automatically

At 9 PM, BuildUNIX generates a narrative PDF with site activity, photos, progress, open snags, and flagged anomalies. No one has to manually compile the day.

The business case shows up before the project is over.

₹2-5 L

rework cost avoided per incident when sequencing errors are prevented

<90 Days

payback period for subscribing firms, based on the investor guide

128+

subphases tracked across the built-in 14-phase construction template

<2 sec

real-time heatmap update latency for live site visibility

Built for Indian PMC-led construction, not generic task tracking.

Built for PMC-led projects

The system is strongest on projects where PMC approval is already the operational truth but the enforcement and evidence trail are missing.

Designed for multi-block execution

It fits sites with multiple towers, simultaneous trades, and many active subphases where WhatsApp coordination breaks down fastest.

Ready for Indian site reality

Offline capture, sunlight-readable mobile flows, and built-in Indian construction phase coverage make it practical on actual sites, not just in demos.

More than a dashboard. It becomes the project record.

01

14-phase India-native template

The platform is pre-configured for Indian residential construction rather than asking teams to rebuild their workflow inside a generic Western SaaS tool.

02

6-type dependency engine

Sequential, Parallel, Merge, Independent, Nested Sequential, and Final Parallel Check logic allow real construction sequencing to be enforced instead of merely tracked.

03

Daily compliance record by default

The audit trail grows automatically: approvals, photos, snags, comments, and AI reports accumulate into a defensible project record that gets more valuable over time.

See why BuildUNIX works better on a real site.

We'll walk you through the dependency engine, photo evidence flow, snag lifecycle, and live heatmap on an active project.

Book Your Demo